How it works

Fill in your contact details and application scenario. Technical detail fields can be skipped if you need help with sizing.

If you need a Static Transfer Switch (STS) solution, enable the corresponding block at the end of the form.

Equipment selection questionnaire

Required fields are marked with an asterisk. Some fields appear based on your answers.

Contact details

So we can clarify details and send a proposal.

This field is required
This field is required
This field is required
This field is required
This field is required
This field is required

Basic project requirements

1. Application scenario (multiple choice)
This field is required

Detailed technical parameters

Complete available technical data for more accurate equipment selection.

This field is required
This field is required
This field is required
This field is required
This field is required
4. Grid outages present?
This field is required
This field is required
This field is required
This field is required
This field is required
9. Battery Connection Method
This field is required
This field is required
11. Installation: Indoor / Outdoor
This field is required
This field is required
This field is required
This field is required
This field is required
16. Emergency diesel generator required on site?
This field is required
This field is required
This field is required
Note: For usable capacity at the POC, please contact our sales team.
To discuss a Static Transfer Switch (STS) solution, enable the block below.

Static Transfer Switch (STS) requirements (on/off-grid)

Complete only if needed. PV data is captured above (items 10–11).

Load types and switching time refer to the STS scheme. If PV is included, use the PV power field above.
1. Critical load types
This field is required
This field is required
This field is required
5. On/off-grid switching time
This field is required
This field is required
7. Diesel generator involved in the STS scheme?
This field is required
This field is required
This field is required
Note: A diesel generator and PV cannot simultaneously feed the STS load side together with the PCS — confirm the single-line diagram with an SBEW engineer.